So where were we?
Ah, yes, the façade. The epic project to end all projects.
To recap: scaffold went up, and we had 28 days to strip. On day 29, the scaffolding turned into a pumpkin and went on to a different job site.
So where were we?
Ah, yes, the façade. The epic project to end all projects.
To recap: scaffold went up, and we had 28 days to strip. On day 29, the scaffolding turned into a pumpkin and went on to a different job site.
With the weather getting cooler stupid cold, the work outside has slowed stopped. October/November were not particularly productive because work (as in we need to fund this restoration by actually working) got in the way. Here is where we left things off:
The garden level is mostly done, but there are still some stubborn patches, primarily where the stone is deteriorating. It’s particularly bad where there are patches on the brownstone. I have yet to find a good method of removing paint from cement (at least I think it’s cement – I can’t tell for sure since it’s covered in paint).
Not surprisingly, we are STILL waiting for estimates from the contractors for the stripping and repairing of the brownstone. Somehow, I have a feeling I’m in this for the long haul and I best get cracking and learn how to patch the stone myself.