Big Project Week 4 (5, 6, 7…)

So where were we?

Ah, yes, the façade. The epic project to end all projects.

To recap: scaffold went up, and we had 28 days to strip. On day 29, the scaffolding turned into a pumpkin and went on to a different job site.

On the to-do list:

  • Repair holes in cornice, paint cornice
  • Stip façade
  • Remove vinyl flashing form around windows, restore old window frames (hoping those were still there)
  • Restore turned columns (which we hoped were still there).

So here is what got done:

Cornice. Our tin cornice had several holes. The part above the corbels is actually really thin – so thin that an overly enthusiastic wayward bird could puncture it.

cornice-beofre

So the holes got patched up with Bondo. The orange paint got scrapped off and the whole thing got coat of oil based paint in flat black.

Here is the cornice in progress:

cornice-repari

cornice-being-repaired

Here is the cornice all done:

finished-cornice2

 Next up, the windows. The two turned columns were still there, however they were very damaged. The flashing did an excellent job of trapping moisture, which in turn rotted the wood.

IMG_1324

Ugly flashing covered the columns

IMG_3238

and trapped moisture, which did a number on the wood

IMG_1328

The hubs rebuild and re-sculped the parts of the columns that were missing bits. Eventually these will need to come down for a full restoration, but for now they a) look good enough from street level and b) we stopped any further damage.

A coat of primer and paint and now they look like this:

columns-after

Columns partially restored and painted to prevent further damage. Paint is left over from the front door project from a couple of years ago. 

Aaaaand the paint stripping. This one is self explanatory (but I’m working on a post about how to DIY your very own façade stripping, which is really not as scary as it seems). For now, suffice to say: PeelAway1 + Time + Water = pretty brownstone.

facade-bedore2

Before scaffolding went up , the house looked like this. 

The thing with stripping paint is ‘easy does it.’ You have to work in small areas and it’s super hard to resist the urge to just cover the whole damn façade in PeelAway all at once. Don’t! There is a limit to how much you can accomplish in a day, and if you over do it, you’ll be racing daylight (and exhaustion) to get it all off before it hardens beyond removal (which means you have to apply paint stripper to the paint stripper, and that’s just counter productive)

peelaway1

After the paint was removed, the stone was washed with citric acid, to bring the pH of the wall as close to neutral as possible. The citric acid, in turn, removed the old mortar in between the sheets of brownstone. So the entire façade was repointed with the appropriate mortar mix (not modern cement, because that will crack the stone).

facade-after

The gray/light brown stuff on the wall between the window and the door is the runny left-overs of the old mortar. It will be washed off eventually. Will take some elbow grease to get it off. 

There are a few areas of stubborn pink paint. These are patches where the stone was improperly repaired in the past.  We found it impossible to remove the paint from it, so at some point in the near future, we’ll have a mason drill it out and do a proper repair job. This is one of those things that is well above our DIY skill level.

facadeafter3

Palor window frames mid restoration. The white is just premier. 

facadeafter2

The project started on August 1, with the delivery of the scaffold. The majority of the work was completed by August 22nd, when the hubs had to go back to work. We still worked on it over the weekend, until the scaffold came down on August 29.

How much did it cost?

  • Scaffold rental: $603.17
  • PeelAway 1 and related supplies: $374.25
  • Masonry supplies: $112.02
  • Other supplies (window restoration, new ladder, primer/paint, etc): $1,255.89

TOTAL COST: $2,345.33 (plus a whole year’s vacation taken in one chunk).

Cost was one of the two major factors why we decided to tackle this project ourselves. The estimates we were getting just for the façade work (not including fixing the cornice or dealing with the window flashing) started around 60K. The second deciding factor was that none of the contractors we spoke with wanted to use the technique we felt would do the least amount of damage to the stone. We hard a lot of power-washing/jackhammering, so, um…. no.

 

Update-ish

With the weather getting cooler stupid cold, the work outside has slowed  stopped. October/November were not particularly productive because work (as in we need to fund this restoration by actually working)  got in the way. Here is where we left things off:

Facade

The garden level is mostly done, but there are still some stubborn patches, primarily where the stone is deteriorating. It’s particularly bad where there are patches on the brownstone. I have yet to find a good method of removing paint from cement (at least I think it’s cement – I can’t tell for sure since it’s covered in paint).

Facade2

Not surprisingly, we are STILL waiting for estimates from the contractors for the stripping and repairing of the brownstone. Somehow, I have a feeling I’m in this for the long haul and I best get cracking and learn how to patch the stone myself.

Another day, another project (and a post with terrible photos).

A normal person may look at what projects need to be done and prioritize accordingly. A normal person may look carefully at the options available and make sure not to overburden themselves by taking on more than they can handle. A normal person will finish a project before starting a new one.

Well, normal people we are not.

Over labor day weekend, we tore out the bedroom ceiling. A cheap patch job of installing a false dry wall ceiling (and covering it with popcorn) robbed the room of its original height – plus it left us wondering what lurked above it.

Old Ceiling

This is how it used to be (pardon the cell phone photos, but in possibly what was the only case of good judgment here, we did not bring the big camera in with us).

Half gone

Dry wall pulled down, you can see the old ceiling through the 2x4s

Turns out the damaged original ceiling was still up there, minus a big chunk of plaster right in the middle. It was severely bowed towards the center of the room, which is probably why the plaster fell off. There were signs of water damage. Fun!

Just a little bit of plaster missing...

Just a little bit of plaster missing… And seriously – what’s up with all the popcorn?

After we removed both ceilings and the original lath, we discovered that the support structure  was compromised: the strips of wood attaching the ceiling to the roof had come lose over the years.

lath

Presented without comment

Open ceiling

Open ceiling, cockloft above.

With the ceiling gone, we had a good look at the space above – more like a crawl space than an attic, it’s called a cock loft (and yes, because I’m totally immature I can’t say it without giggling). It’s kinda interesting to see the structure from above: the sky lights, some strange built-in alcoves. The filth up there is indescribable, the dirt is nearly impossible to wash off the skin. I suppose that’s what 120 years of dust, coal, cigarette smoke, and old fart residue looks like. Absolutely gross.

Dirt

This photo doesn’t fully capture how dirty we were. And by the way, the Facetime camera on the iPhone is absolutely awful!

The space is now ready to be re-built. We saved a piece of the ceiling molding so that we can restore it in the new ceiling. Sadly, most of it was gone so we’ll have to rebuild from scratch.

Moulding chunk

It was a total bummer to have to remove the moulding, but most of it was already gone. What was left did put up a good fight. We will use this chunk as a template for the restoration.

Since all the prep work has been done, you’d think we’d finish it off quickly. That is where you’d be wrong. This past weekend was dedicated to working on the stoop railing and doing a test stripping of the brownstone. Why? Well, winter is coming and it needs to be done. The stoop has been the Hubs pet project during the summer. Amidst finishing grad school, the crazy rains of June and the sweltering temps of July, progress has been slow. Happy to report one whole side has been stripped and coated with primer.

As for the masonry, we’re having a hard time finding someone who will strip/repair the brownstone the in the way we feel it should be done.   So I decided to do some tests and see if I could do it myself.

Cue stripping test #1: Some PeelAway 1, a bit of time, some water and some citric acid later – voila! Brownstone without paint.

IMG_1454

Step 1: apply layer of PeelAway that is at least 1/8 of an inch think. Kinda like frosting a warm cake. Got a bit melt-y…

IMG_1456

Step 2: Cover with the nifty paper provided. And wait.

IMG_1462

Step 3: remove the goop and wash. And wash. And wash. Then spritz some citric acid and wash again.

IMG_1474

And there you have it: stone (mostly) free of paint.

My biggest problem is that I’m super afraid of heights and I have no idea how I’ll get to the second and third floors….