A normal person may look at what projects need to be done and prioritize accordingly. A normal person may look carefully at the options available and make sure not to overburden themselves by taking on more than they can handle. A normal person will finish a project before starting a new one.
Well, normal people we are not.
Over labor day weekend, we tore out the bedroom ceiling. A cheap patch job of installing a false dry wall ceiling (and covering it with popcorn) robbed the room of its original height – plus it left us wondering what lurked above it.

This is how it used to be (pardon the cell phone photos, but in possibly what was the only case of good judgment here, we did not bring the big camera in with us).
Turns out the damaged original ceiling was still up there, minus a big chunk of plaster right in the middle. It was severely bowed towards the center of the room, which is probably why the plaster fell off. There were signs of water damage. Fun!
After we removed both ceilings and the original lath, we discovered that the support structure was compromised: the strips of wood attaching the ceiling to the roof had come lose over the years.
With the ceiling gone, we had a good look at the space above – more like a crawl space than an attic, it’s called a cock loft (and yes, because I’m totally immature I can’t say it without giggling). It’s kinda interesting to see the structure from above: the sky lights, some strange built-in alcoves. The filth up there is indescribable, the dirt is nearly impossible to wash off the skin. I suppose that’s what 120 years of dust, coal, cigarette smoke, and old fart residue looks like. Absolutely gross.

This photo doesn’t fully capture how dirty we were. And by the way, the Facetime camera on the iPhone is absolutely awful!
The space is now ready to be re-built. We saved a piece of the ceiling molding so that we can restore it in the new ceiling. Sadly, most of it was gone so we’ll have to rebuild from scratch.

It was a total bummer to have to remove the moulding, but most of it was already gone. What was left did put up a good fight. We will use this chunk as a template for the restoration.
Since all the prep work has been done, you’d think we’d finish it off quickly. That is where you’d be wrong. This past weekend was dedicated to working on the stoop railing and doing a test stripping of the brownstone. Why? Well, winter is coming and it needs to be done. The stoop has been the Hubs pet project during the summer. Amidst finishing grad school, the crazy rains of June and the sweltering temps of July, progress has been slow. Happy to report one whole side has been stripped and coated with primer.
As for the masonry, we’re having a hard time finding someone who will strip/repair the brownstone the in the way we feel it should be done. So I decided to do some tests and see if I could do it myself.
Cue stripping test #1: Some PeelAway 1, a bit of time, some water and some citric acid later – voila! Brownstone without paint.

Step 1: apply layer of PeelAway that is at least 1/8 of an inch think. Kinda like frosting a warm cake. Got a bit melt-y…
My biggest problem is that I’m super afraid of heights and I have no idea how I’ll get to the second and third floors….
That’s amazing but a lot of work to do the whole facade.
Pingback: Finished floors | A Pink Brownstone in Brooklyn