Laboring weekend

What a difference a long weekend makes.

Since we still have all our stuff out of our bedroom following the stripping of the woodwork, we decided to tackle the ceiling. Truth be told, I’ve been wanting to rip this down since we first saw the house, since this awful ceiling is guilty of robbing the room of almost a foot in height (and popcorn? Ew!)

Over the course of the weekend, we took down the drop ceiling, as well as what was left of the original plaster and all of the lath. Here is day 1 in 24 seconds.

All of the gory details and photos in a later post.

2 thoughts on “Laboring weekend

  1. Pingback: 5 months, 23 days (and counting) | A Pink Brownstone in Brooklyn

  2. Pingback: Finished floors | A Pink Brownstone in Brooklyn

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s